Dale L.'s Journal
Home Page: Dale L.
Mendenhall, MS, USA
| Total Posts: 13 | Latest Post: 2020-10-22 |
| Table of Contents | RSS Feed |
Today I rebuilt my brake system. New pads, rotors, rear shoes, brake cylinders, hoses,springs, etc.
Also repacked front bearings while it was off.
Flushed out all brake lines and inspected.
Moss Motors supplied all the parts I needed.
I installed the new fuse box due to fuse #3 had a bad connection on the block.
Next I will do my test drive and decide if I will restore it ot sell it.
So far looks like I may keep it.
Also repacked front bearings while it was off.
Flushed out all brake lines and inspected.
Moss Motors supplied all the parts I needed.
I installed the new fuse box due to fuse #3 had a bad connection on the block.
Next I will do my test drive and decide if I will restore it ot sell it.
So far looks like I may keep it.






Want to leave a comment or ask the owner a question?
Sign in or register a new account — it's free